The day after we closed on the house, he rented a rototiller and dug up and re-sloped the entire yard. We haven't stopped since.
Our current project is the new shower. And of course, there's a back story.
A little over 3 years ago, we remodeled the entire 1st floor bathroom and put in this cool looking shower:
As it turns out, the shower was a total piece of crap. The base was made of some styrofoam stuff (not dense enough) and covered in a thin plastic. The styrofoam got some dents when stepped on, and the the plastic coating cracked in several places. Seems this company thought they could manufacture a shower not made to last 3 years.
So we ripped it out.
T had to change the location of the drain and do a little leveling on the floor. Voila! A new base!
Up went the cement board. Then 3 coats of seriously smelly waterproofing sealant stuff. You think he looks high on fumes here?
When tiling, it's mostly planning the layout and measurements. When properly planned, the tile goes up pretty slick.
Wait till you see the glass doors we're putting in!
Although these projects can get to be a bit tedious (and dusty!) It always pays off with something better in our living space. I for one am ready to have use of my shower back!
No comments:
Post a Comment